Description: Existing leaking BUR/Gravel roof system was torn off completely and replaced with a Tapered Poly-ISO Insulation System followed by Coverboard and a multi-ply asphaltic white Modified Bitumen Roof System with a 20 Year Warranty. Provided all new metal coping and edging and associated sheet metal work.